Current Announcements

PRESS RELEASE

FOR IMMEDIATE RELEASE

DATE: April 20 2021

INFORMATION CONTACT: MICHAEL CLARK, 810-388-4027

Duce Road Bridge Painting is scheduled to begin April 26th, 2021.

Bridge maintenance on Duce Road over Jackson Drain, between Holly Road and Oatman Road is scheduled to begin on April 26th, 2021.
Work will include setting up containment, blast cleaning steel beams, and coating of the steel beams. This work will be completed under a complete closure.
Access will not be maintained to traffic within the construction limits during the project, please seek alternate routes. The posted detour route will use Oatman Road east to Fargo Road (one mile east of Duce Road), south to Holly Road and then west to Duce Road. The detour route is the same for both northbound and southbound traffic. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.

Construction is scheduled to be completed by May 22nd, 2021. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule.

This project is financed by the Federal Highway Administration, St. Clair County Road Commission and Greenwood Township at a total estimated cost for construction of $68,119. The Prime Contractor, Seaway Painting, will be completing the work.

Special Announcement

Per PA254 of 2020 and St. Clair County Resolution 21-03, the Board of Public Works and the Board of Road Commissioners Meetings for Tuesday, April 20, 2021 will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Notification

FROM: Tonia Crawford

DATE: April 15th, 2021

Township: Grant

Road: Graham

Between: Hewitt & Oatman

This section of Graham Road will be closed to all traffic due to storm drain replacement Monday, April 19, 2021 through Thursday, April 22, 2021

Advance Notice

Weed and Brush Control Program

St. Clair County Road Commission

 

The St. Clair County Road Commission will begin its 2021 Herbicide Weed and Brush Control Program on or after June 15, 2021.  Program completion, subject to weather and/or operational factors, is expected by August 1, 2021. 

 

G & T Services, with offices at 1630 Summit Street, New Haven, Indiana, is under contract to the St. Clair County Road Commission to perform weed and brush control services in the road right-of-way on designated county roads in St. Clair County.  The method of application will be land applied by truck mounted spray units. 

 

The Road Commission Weed and Brush Control Program will involve the application of herbicides to weeds and brush at and around guardrails.  The Program will be implemented to improve visibility of guardrail and safety for the vehicular traffic and/or pedestrians that use the county roads under the Road Commission’s jurisdiction.

 

The specific herbicide and specialty products utilized in this treatment will be as follows:

 

Product Name                                  Active Ingredient      Quantity mix/100 gallons of water

Esplanade 200 SC or equivalent  Indaziflam                             5 ounces                  

Method 240SL or equivalent         Aminocyclopytachlor           14 ounces

Arsenal or equivalent                      Imazapyr                                1 quart                       

Rodeo or equivalent                        Glyphosate 5.4                     2 quarts                     

Improve Surfactant or equivalent Non-ionic surfactant            1 quart                       

Dye                                                                 Amount necessary to determine coverage

 

This Advance Notice and information is being supplied in accordance with the Michigan Department of Agriculture, Regulation No. 637 Pre-Notification Requirement.

 

If a property owner prefers their property not be included for treatment, they must complete an application form for a “No Treatment Zone” permit from the Road Commission no later than May 15, 2021.  As a condition of approval of this application, the property owner must agree to properly clear the road right-of-way abutting the subject property of weeds and brush.  Signs supplied by the Road Commission must be in place by June 1, 2021.  Posted areas will be omitted from the Program only if the area is clear of weeds and brush at the time of inspection by the Contractor and/or Road Commission personnel.

 

Technical information concerning this application may be requested by calling G & T Services at 1-260-493-9531.  Administrative and operational information may be obtained from the St. Clair County Road Commission Operations Department at 1-810-388-4025. 

 

Kirk D. Weston, Managing Director

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: April 13, 2021

SUBJECT: CULVERT POSTING CHANGE in Brockway Twp.

Due to advancing steel culvert deterioration the following structure's maximum loading rating has been decreased:

Fulton Road over McLane Drain (C-20) in Brockway Twp.

  • Culvert is 1685 feet northwest of Wilkes Road

Previous Posting

None

NEW Posting

Current structure capacity is:

16 ton - Single

25 ton - Double

42 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: April 13, 2021

SUBJECT: CULVERT POSTING CHANGE in Kimball Twp.

Due to advancing concrete culvert deterioration the following structure's maximum loading rating has been decreased:

Burns Road over Smiths Creek (C-19) in Kimball Twp.

  • Culvert is 370 feet north of Smiths Creek Road

Previous Posting

None

NEW Posting

Current structure capacity is:

18 ton - Single

25 ton - Double

45 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: April 13, 2021

SUBJECT: CULVERT POSTING CHANGE in Kimball Twp.

Due to advancing steel culvert deterioration the following structure's maximum loading rating has been decreased:

Mayer Road over Wolvin Drain (C-36) in Kimball Twp.

  • Culvert is 1235 feet north of Ravenswood Road

Previous Posting

9 ton - Single

25 ton - Double

52 ton - Triple

NEW Posting

Current structure capacity is:

7 ton - Single

10 ton - Double

18 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: April 13, 2021

SUBJECT: CULVERT POSTING CHANGE in St. Clair Twp.

Due to advancing steel culvert deterioration the following structure's maximum loading rating has been decreased:

Bowman Road over Angel Creek Drain (C-23) in St. Clair Twp.

  • Culvert is 1890 feet southeast of Bartlett Road

Previous Posting

Not Currently Posted

NEW Posting

Current structure capacity is:

11 ton - Single

17 ton - Double

26 ton - Triple

PRESS RELEASE

FOR IMMEDIATE RELEASE

DATE: April 12, 2021

INFORMATION CONTACT: Paul Zeller, 810-364-5720

Revised - Comstock Road Bridge Painting is scheduled to begin Today, April 12th, 2021.

Bridge maintenance on Comstock Road over Eves Drain, between Jeddo Road and Cribbins Road, has begun on April 12th, 2021.

Work will include setting up containment, blast cleaning steel beams, and coating of the steel beams. This work will be completed under a complete closure.

Access will not be maintained to traffic within the construction limits during the project, please seek alternate routes. The posted detour route will use Jeddo Road east to Cribbins Road, south to Comstock Road. The detour route is the same for both northbound and southbound traffic. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.

Construction is scheduled to be completed by May 18th, 2021. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule.

This project is financed by the Federal Highway Administration, St. Clair County Road Commission and Greenwood Township at a total estimated cost for construction of about $93,000. The Prime Contractor, Seaway Painting LLC, will be completing the work.

PRESS RELEASE

FOR IMMEDIATE RELEASE

DATE: April 9, 2021

INFORMATION CONTACT: Paul Zeller, 810-364-5720

Comstock Road Bridge Painting is scheduled to begin April 21st, 2021.

Bridge maintenance on Comstock Road over Eves Drain, between Jeddo Road and Cribbins Road, is scheduled to begin on April 21st, 2021. Work will include setting up containment, blast cleaning steel beams, and coating of the steel beams. This work will be completed under a complete closure.

Access will not be maintained to traffic within the construction limits during the project, please seek alternate routes. The posted detour route will use Jeddo Road east to Cribbins Road, south to Comstock Road. The detour route is the same for both northbound and southbound traffic. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience. Construction is scheduled to be completed by May 18th, 2021. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule.

This project is financed by the Federal Highway Administration, St. Clair County Road Commission and Greenwood Township at a total estimated cost for construction of about $93,000. The Prime Contractor, Seaway Painting LLC, will be completing the work.

Special Announcement

Per PA254 of 2020 and St. Clair County Resolution 21-03, the Board of Public Works and the Board of Road Commissioners Tuesday, April 6th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

PRESS RELEASE

FOR IMMEDIATE RELEASE

DATE: April 1, 2021

INFORMATION CONTACT: Michael Clark, 810-364-5720 or mclark@stclaircounty.org

Flamingo Road Bridge over Unnamed Canal Construction to begin April 1,2021.

Construction on Flamingo Road Bridge over Unnamed Canal in Clay Township is set to begin on April 1, 2021. Construction includes removal of the old bridge, placing new concrete abutments and piers, new steel sheeting walls, new timber deck, new guardrail, rebuild about 100 feet of road approaches on each side of the bridge, and seeding of disturbed earth areas. The purpose of this project is to replace a structurally defiance bridge that is currently load weight restricted.

Traffic will be reduced to one-lane and can be accessed by turning right only off of M-29 and crossing the temporary bridge. Left-turn movement from M-29 onto Flamingo Road will be prohibited with left-turn traffic being detoured. Residents are requested to be patient because of the delays due to construction.

This project is financed by the Federal Highway Administration, State of Michigan, St. Clair County Road Commission and Clay Township at a total estimated cost for construction of $1,377,800.

The prime contractor is E.C. Korneffel Co. of Trenton, MI.

The contract completion date is July 30, 2021.

PRESS RELEASE

FOR IMMEDIATE RELEASE

DATE: March 25, 2021

INFORMATION CONTACT: PAUL ZELLER, 810-364-5720

Bricker Road Bridge Painting is scheduled to begin April 6th, 2021.

Bridge maintenance on Bricker Road over Mill Creek, between O’Conner Road and Beard Road (M-136), is scheduled to begin on April 6th, 2021.

Work will include setting up containment, blast cleaning steel beams, and coating of the steel beams. This work will be completed under a complete closure.


Access will not be maintained to traffic within the construction limits during the project, please seek alternate routes. The posted detour route will use Beard Road (M-136) east to Brown Road (one mile east of Bricker), south to Thomas Road, and then west to Bricker Road. The detour route is the same for both northbound and southbound traffic. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.


Construction is scheduled to be completed by April 27th, 2021. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule.

This project is financed by the Federal Highway Administration, St. Clair County Road Commission and Kenockee Township at a total estimated cost for construction of $105,000. The Prime Contractor, Seaway Painting, will be completing the work.

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: March 24, 2021

SUBJECT: BRIDGE POSTING CHANGE in Wales Twp.

Due to construction to totally replace the bridge, the load posting is no longer needed:

Castor Road over Neaton Drain (23-21L) in Wales Twp.

Previous Posting

5 ton - Single

7 ton - Double

14 ton - Triple

NEW Posting

Current structure capacity is:

No Load Posting Required for All Legal Loads

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: March 24, 2021

SUBJECT: BRIDGE POSTING CHANGE in Brockway Twp.

Due to advancing concrete and steel beam deterioration the following structure's maximum load rating has been decreased:

Yale Road over Mill Creek (2-01) in Brockway Twp.

Previous Posting

Not Currently Posted

NEW Posting

Current structure capacity is:

41 ton - Single

65 ton - Double

76 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: March 24, 2021

SUBJECT: BRIDGE POSTING CHANGE in Riley Twp.

Due to advancing concrete and steel beam deterioration the following structure's maximum load rating has been decreased:

Braidwood Road over Sharrard-Burgess Drain (21-9L) in Riley Twp.

Previous Posting

18 ton - Single

23 ton - Double

39 ton - Triple

NEW Posting

Current structure capacity is:

10 ton - Single

14 ton - Double

25 ton - Triple

Weight Restrictions Notification

Effective Friday, March 26, 2021 beginning at 8:00am; normal loading will resume on all St. Clair County Roads. Reduced load restrictions have been in place since March 03, 2021 in effort to minimize surface and sub-surface damage during the warming weather.

The re-issuance of overweight permits will also resume on March 26, 2021

Road Opening Notification

FROM: Tonia Crawford

DATE: March 19th, 2021

Due to weather related road conditions Frith Road has been closed since 03/11/2021.

Road is now open to traffic.

Road Opening Notification

FROM: Tonia Crawford

DATE: March 19th, 2021

SUBJECT: Castor Road Bridge Replacement update

Castor Road Bridge Replacement project started March 01, 2021 with a completion date of March 22, 2021.
Work has been completed ahead of schedule... Castor Road will be open to traffic today, 03/19/2021 @ 3:00PM

Road Closure Notification

FROM: Tonia Crawford

DATE: March 18th, 2021

Township: Wales

Road: Goodells

Between: Morris & County Park

This section of Goodells Road will be closed to all traffic Monday, 03/22/2021 through Friday, 03/26/2021 due to CN Railroad rail replacement project.

Detour will be posted: Sparling to Wales Center to Lapeer

Road Opening Notification

FROM: Tonia Crawford

DATE: March 18th, 2021

Belle River Road between Indian Trail & Marsh has been closed since March 08, 2021 due to slope repair & guardrail replacement.

Work is now complete and Belle River Road is open to traffic.

Special Announcement

Per PA254 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, March 16th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Notification

FROM: Tonia Crawford

DATE: March 11rd, 2021

Township: St. Clair

Road: Frith

Between: Pine River and Wadhams

This section of Frith Road will be closed to all traffic until further notice.

Road Closure Notification Update

FROM: Tonia Crawford

DATE: March 3rd, 2021

Township: China Township

Road: Belle River

Between: Indian Trail & Marsh

This section of Belle River Road will be closed for approximately two weeks starting on March 08, 2021 due to slope repair and guardrail replacement 1/4 mile east of Indian Trail.

Emergency vehicles & School Transportation will have access.

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: March 02, 2021

SUBJECT: CULVERT POSTING CHANGE in China Twp.

Due to advancing steel culvert deterioration the following structure's maximum load rating has been decreased:

St. Clair Hwy over Layle-Robbins Drain (C-116) in China Twp.

  • Culvert is 700 feet west of King Road

Previous Posting

NONE

NEW Posting

Current structure capacity is:

14 ton - Single

32 ton - Double

36 ton - Triple

Special Announcement

Per PA254 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, March 2nd Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

FOR IMMEDIATE RELEASE

DATE: February 24, 2021

INFORMATION CONTACT: BILL HAZELTON, 810-388-4026

Castor Road Bridge Replacement is scheduled to begin March 1st, 2021.

A bridge replacement on Castor Road over Neaton Drain, between County Park Drive and Lapeer Road, is scheduled to begin on March 1st, 2021.

Work will include removal of the existing bridge structure, the placement of a new aluminum box culvert and then placing a new HMA surface over the structure. This work will be completed under a complete closure.

Access will not be maintained to traffic within the construction limits during the project, please seek alternate routes. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience. Construction is scheduled to be completed by March 22nd, 2021. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule.

This project is financed by the St. Clair County Road Commission and Wales Township at a total estimated cost for construction of $210,000. The St. Clair County Road Commission will be completing the work.

Special Announcement

Per PA254 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, February 16th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: February 04, 2021

SUBJECT: CULVERT POSTING CHANGE in Wales Twp.

Due to advancing concrete deterioration the following structure's maximum load rating has been decreased:

Green Road over Green Drain 23-6L in Wales Twp.

  • Bridge is 4015 feet west of Wales Center Road

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

42 ton - Single

66 ton - Double

67 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: February 04, 2021

SUBJECT: CULVERT POSTING CHANGE in Wales Twp.

Due to advancing steel beam deterioration the following structure's maximum load rating has been decreased:

Lashbrook Road over Unnamed Creek 23-27L in Wales Twp.

  • Culverts are 870 feet west of Parks Road

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

19 ton - Single

42 ton - Double

42 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: February 04, 2021

SUBJECT: CULVERT POSTING CHANGE in Wales Twp.

Due to advancing concrete beam deterioration the following structure's maximum load rating has been decreased:

Webb Road over S.Br.of Pine River 23-03L in Wales Twp.

  • Culverts are 3085 feet east of Oneil Road

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

30 ton - Single

53 ton - Double

64 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: February 04, 2021

SUBJECT: CULVERT POSTING CHANGE in Riley Twp.

Due to advancing steel beam deterioration the following structure's maximum load rating has been decreased:

Braidwood Road over Belle River 21-04L in Riley Twp.

  • Bridge is 665 feet south of Gilbert

Previous Posting

18 ton - Single

30 ton - Double

65 ton - Triple

NEW Posting

Current structure capacity is:

18 ton - Single

30 ton - Double

43 ton - Triple

Special Announcement

Per PA254 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, February 2nd Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: January 25, 2021

SUBJECT: CULVERT POSTING CHANGE in St. Clair Twp.

Due to advancing steel deterioration the following structure's maximum load capacity has been decreased to a point of being unsafe:

Klettner Road over Moak Drain 22-14L in St. Clair Twp.

  • Bridge is 3255 feet east of Wadhams Road

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

CLOSED TO ALL TRAFFIC - Starting Friday, 1/29/21 in afternoon.

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: January 19, 2021

SUBJECT: CULVERT POSTING CHANGE in Brockway Twp.

Due to advancing steel deterioration the following structure's maximum load rating has been decreased:

Jeddo Road over Mill Creek (west) 2-3L in Brockway Twp.

  • Bridge is 530 feet east of Arendt Road

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

42 ton - Single

72 ton - Double

82 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: January 19, 2021

SUBJECT: CULVERT POSTING CHANGE in Clay Twp.

Due to advancing concrete deterioration the following structure's maximum load rating has been decreased:

Blubill Road over Unnamed Canal 6-6L in Clay Twp.

  • Bridge is 200 feet west of M-29

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

42 ton - Single

56 ton - Double

67 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: January 19, 2021

SUBJECT: CULVERT POSTING CHANGE in Ira Twp.

Due to advancing concrete deterioration the following structure's maximum load rating has been decreased:

Arnold Road over Unnamed Creek 15-1L in Ira Twp.

  • Bridge is 1675 feet east of Meldrum Road

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

42 ton - Single

71 ton - Double

82 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: January 19, 2021

SUBJECT: CULVERT POSTING CHANGE in Ira Twp.

Due to advancing concrete deterioration the following structure's maximum load rating has been decreased:

Arnold Road over Swan Creek 15-2L in Ira Twp.

  • Bridge is 365 feet west of Hessen Road

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

42 ton - Single

61 ton - Double

76 ton - Triple

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry Westrick & Kirk Weston

FROM: Mike Clark

DATE: January 19, 2021

SUBJECT: CULVERT POSTING CHANGE in Burtchville Twp.

Due to advancing steel deterioration the following structure's maximum load rating has been decreased:

Fisher Road over Burtch Creek 3-2L in Burtchville Twp.

  • Bridge is 730 feet west of M-25

Previous Posting

NOT POSTED

NEW Posting

Current structure capacity is:

28 ton - Single

34 ton - Double

43 ton - Triple

Special Announcement

Per PA254 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, January 19th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Special Announcement

Per PA228 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, January 5th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Please click here to view our 2021 Schedule of Board Meetings!

Special Announcement

Per PA228 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, December 15st Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

FOR IMMEDIATE RELEASE
DATE: 12/09/2020
FOR INFORMATION, CONTACT: Mike Clark - (810) 388-4027 or mclark@stclaircounty.org

Meisner Road Bridge between Belle River Rd. and M-29 in East China Township is Open to Traffic at 1:00pm Today, December 9,2020.

Construction included removing the existing bridge superstructure, installing new steel I-beams with concrete deck superstructure, new guardrail, HMA paving, and restoration.
This project was financed by the St. Clair County Road Commission, County Road Millage Funds and the State of Michigan at a total estimated cost for construction of $1,999,650.77.
The prime contractor was Davis Construction Company of Lansing, Michigan.

Special Announcement

Per PA228 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, December 1st Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Special Announcement

Per PA228 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, November 17th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Special Announcement

Per PA228 of 2020, the Board of Public Works and the Board of Road Commissioners Tuesday, November 3th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Update

FROM: Tonia Crawford

DATE: October 29th, 2020

Township: Grant Township

Road: Vincent

Between: Jeddo & Harris

This section of Vincent Road has been closed since 10/12/2020.

This Road Construction project will be completed soon and the road will be back open to traffic by 6:00AM on Monday, November 02, 2020.

Road Closure Notification Update

FROM: Tonia Crawford

DATE: October 9th, 2020

Township: Grant Township

Road: Vincent

Between: Jeddo & Harris

This section of Vincent Road will be closed to all traffic starting Monday, 10/12/2020 at 7:30AM *Revised 10-19-20

This section of Vincent Road is closed to all traffic until further notice.

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, October 20th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Notification

FROM: Tonia Crawford

DATE: October 9th, 2020

Township: Grant Township

Road: Vincent

Between: Jeddo & Harris

This section of Vincent Road will be closed to all traffic starting Monday, 10/12/2020 at 7:30AM until Friday, 10/16/2020 at 3:30PM due to a Road Construction Project.

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, October 6th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Notification

FROM: Tonia Crawford

DATE: September 28, 2020

Township: Clay- Harsens Island

The following roads have been closed since 04/07/2020 due to flooding. Water levels have returned to normal and these roads are now open to traffic.

Columbine between Krispin and Voakes

Voakes between Columbine and M-154

Road Reopening Notification

FROM: Tonia Crawford

DATE: September 25, 2020

Township: Columbus

Road: Rattle Run

Between: Palms & Hessen

Rattle Run Road has been closed since September 08, 2020 due to a culvert replacement project.

Work was completed ahead of schedule. Rattle Run Road is now open to traffic.

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, September 15th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

FOR IMMEDIATE RELEASE
DATE: 9/9/2020
FOR INFORMATION, CONTACT: JENNIFER NELSON 810-300-6907

UPDATE - Range Road and Dove Road Intersection Reopening starting September 11, 2020.Weather has delayed completion of the project.

Weather has delayed completion of the project. The roundabout construction at Dove Road, Range Road and the exit from I-94, will be complete and the roads opened to traffic on Friday, September 11, 2020.

Work includes constructing a roundabout in the intersection, and reconstructing approximately ¼ mile of Dove Road up to the previous reconstruction limits.

This project is financed by the St. Clair County Road Commission, the State of Michigan and the Federal Highway Administration at a total estimated cost for construction of $1,160,000. This is a joint contract with Martin J and Boddy Construction Company.

FOR IMMEDIATE RELEASE
DATE: 9/2/2020
FOR INFORMATION, CONTACT: JENNIFER NELSON 810-300-6907

Range Road and Dove ROad Intersection Reopening starting September 9, 2020.
Roundabout construction at Dove Road, Range Road and the exit from I-94, will be complete and the roads opened to traffic on Wednesday, September 9, 2020.

Work includes constructing a roundabout in the intersection, and reconstructing approximately ¼ mile of Dove Road up to the previous reconstruction limits.

This project is financed by the St. Clair County Road Commission, the State of Michigan and the Federal Highway Administration at a total estimated cost for construction of $1,160,000. This is a joint contract with Martin J and Boddy Construction Company.

 

 

Road Closure Notification

FROM: Tonia Crawford

DATE: September 1, 2020

Township: Columbus

Road: Rattle Run

Between: Palms & Hessen

Rattle Run will be closed to all traffic September 08, 2020 - September 28, 2020 Due to a Culvert Replacement Project.

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, September 1th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

MEMORANDUM

ROAD COMMISSION DEPARTMENT OF PUBLIC WORKS

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry
Westrick & Kirk Weston

FROM: Mike Clark

DATE: August 21, 2020

SUBJECT: CULVERT POSTING CHANGE in  Cottrellville Twp.

Due to advancing steel deterioration the following structure's maximum load rating has been decreased:
McKinley Road over West Marsh Drain (C-26) in Cottrellville Twp.

Culvert is 1160 feet north of Lozon Road
Previous Posting

NOT POSTED

NEW Posting
Current structure capacity is:
14 ton - Single

26 ton - Double

32 ton - Triple

MEMORANDUM

ROAD COMMISSION DEPARTMENT OF PUBLIC WORKS

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry
Westrick & Kirk Weston

FROM: Mike Clark

DATE: August 21, 2020

SUBJECT: CULVERT POSTING CHANGE in  Cottrellville Twp.

Due replacement of the existing culvert with a new concrete box culvert the following structure's maximum load rating has been increased:
Starville Road over Beaubien Creek C13) in Cottrellville Twp.

Culvert is 1135 feet south of Markel Road
Previous Posting
8 ton – Single
26 ton – Double
26 ton - Triple
NEW Posting
Current structure capacity is:
NO POSTING for Legally Loaded Vehicles

FOR IMMEDIATE RELEASE
DATE: 8/6/2020
FOR INFORMATION, CONTACT: BILL HAZELTON 810-388-4026

Starville Road over Beaubien Creek in Cottrellville Township will be closed starting August 10 for approximately 2 weeks.
Work includes removing and replacing the existing culvert. The closure period will be weather dependent.
Starville Road is closed from 800’ south of Markel Road to 1200’ north of Shortcut Road. The posted detour for the project will be Markel Road, Mayer Road, and Broadbridge Road.
Traffic will not be permitted across the Beaubien Creek during the closure. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.
This project is financed by the St. Clair County Road Commission at a total estimated cost for construction of $225,000. The work will be performed be St. Clair County Road Commission Crews.

 

 

Wadhams Road between Rattle Run & Neuman (St. Clair Twp.)  has been closed since 7/27/2020 due to culvert replacement.

Work is now complete and the Road is open to traffic.

FOR IMMEDIATE RELEASE
DATE: 7/31/2020
FOR INFORMATION, CONTACT: JENNIFER NELSON 810-300-6907

North Road Resurfacing is scheduled to begin August 3, 2020.
Resurfacing work on North Road, from Lightle Road to Keewahdin Road (M-136), is scheduled to begin on August 3, 2020.
Work will include widening and extending the right turn lane for northbound North Road at Krafft Road, and then placing a chip seal and thin overlay from Lightle Road to Keewahdin Road.
The project will begin with the right turn lane improvements at the Krafft Road intersection. This work will be completed under a lane closure utilizing flaggers. Following completion of the intersection improvements, the chip seal and HMA overlay will be completed under a lane closure utilizing flaggers.
Access will be maintained throughout the entire project. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience. Construction is scheduled to be completed by September 3, 2020. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule. This project is financed by the St. Clair County Road Commission, the State of Michigan and the Federal Highway Administration at a total estimated cost for construction of $385,000. The prime contractor is Ace-Saginaw Paving Company.

 

 

MEMORANDUM

ROAD COMMISSION DEPARTMENT OF PUBLIC WORKS

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry
Westrick & Kirk Weston

FROM: Mike Clark

DATE: July 24, 2020

SUBJECT: CULVERT POSTING CHANGE in  Riley Twp.

Due to advancing steel deterioration the following structure's maximum load rating has been decreased:
Eagling Road over Sharrard-Burgess Drain (C-15) in Riley Twp.
Culvert is 750 feet north of Hough Road
Previous Posting
9 ton – Single
28 ton – Double
45 ton - Triple
NEW Posting
Current structure capacity is:
3 ton – Single
3 ton – Double
3 ton - Triple

Road Closure Notification

FROM: Tonia Crawford

DATE: July 23, 2020

Township: St Clair

Road: Wadhams

Between: Rattle Run & Neuman

Wadhams Road will be closed to all traffic due to a culvert replacement project

Starting 7:00AM on Monday 07/28/2020-08/10/2020

Detour will be posted.

For information, Contact: Jennifer Nelson #810/300/6907

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, July 21th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Notification

FROM: Tonia Crawford

DATE: July 15, 2020

Township: Greenwood

Road: Beckett

Between: Cork & Bricker

Beckett Road will be closed to all traffic 7AM on 07/20/2020 until 3:00PM 07/23/2020 due to a crossroad culvert replacement.

FOR IMMEDIATE RELEASE
DATE: 7/14/2020
FOR INFORMATION, CONTACT: Michael J. Clark, PE (810) 388-4027

Hough Road between Eagling Rd. & Braidwood Rd.
Bridge is Open to Traffic at 5:00pm, July 14, 2020

Bridge replacement on Hough Road between Eagling Road and Braidwood Road in Riley Township is complete. The road will be open to traffic by 5:00pm today, July 14, 2020. Construction included removal of the old bridge & gravel road base then installing an aluminum box bridge, concrete road slab, guardrail and seeding of disturbed earth areas. The purpose of this project is to replace a structurally defiance bridge that was closed to traffic for safety. This project was financed by the State of Michigan and St. Clair County Road Commission at a total cost of $350,000.
The prime contractor is St. Clair County Road Commission.

FOR IMMEDIATE RELEASE
DATE: 7/07/2020
FOR INFORMATION, CONTACT: Michael J. Clark, PE (810) 388-4027


Sparling Road between Goodells Road and Emerson Road in Wales Township will be closed to traffic starting the week of July 13th, 2020.
Work includes removing the existing road paving, guardrail, and chipping & patching concrete bridge beams, then installing bridge beam fiber reinforcement, new guardrail, HMA paving, and restoration.
Sparling Road will be closed for approximately 40 consecutive days starting on about July 15th, 2020. Estimated completion date is August 28th, 2020. A detour will be posted during the closure of Sparling Road. The detour will be using Wales Center Road, Lambs Road and Emerson Road. Access will be maintained to local traffic within the construction zone, including homes and businesses, during the closure. Emergency vehicles will have access to local properties throughout the entire project. Access across Moore Creek on Sparling Road will NOT be permitted. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.

This project is financed by the St. Clair County Road Commission, Millage Funds, the State of Michigan and the Federal Highway Administration at a total estimated cost for construction of $310,602.95. The work will be performed by Grand River Construction Inc.

Road Closure Notification

FROM: Tonia Crawford

DATE: July 7, 2020

Township: Wales

Road: Wales Center Road

Between: Hill and Sparling

Wales Center Road is closed to all traffic until 07/27/2020 due to a crossroad culvert replacement. 

 

FOR IMMEDIATE RELEASE
DATE: 7/7/2020
FOR INFORMATION, CONTACT: JENNIFER NELSON 810-300-6907

Dove and Range Road Roundabout Construction is scheduled to begin July 16, 2020.
Construction of a roundabout at the Dove Road-Range Road-EB I-94 Exit intersection is scheduled to begin on July 16, 2020. Work will include constructing a roundabout in the intersection, and reconstructing approximately ¼ mile of Dove Road up to the previous reconstruction limits. The project will occur under a full closure of the Range Road and Dove Road intersection, in addition to the Exit 269 ramp from EB I-94, for a maximum of 50 days to permit construction. The posted detour for the closure will be Smiths Creek Road, Wadhams Road and Griswold Road. EB I-94 traffic should use Exit 266 Gratiot Road, and follow Range Road to the detour route.

Access will be maintained to local traffic within the construction and closure zone, including homes and businesses, during the closure. Local residents and emergency vehicles will have access to local properties throughout the entire project. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.
Access to and from WB I-94 will be maintained, and access to EB I-94 on-ramp will also be maintained but only from north of the intersection. Construction is scheduled to be completed by September 4, 2020. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule. This project is financed by the St. Clair County Road Commission, the State of Michigan and the Federal Highway Administration at a total estimated cost for construction of $1,160,000. This is a joint contract with Martin J and Boddy Construction Company.

 

 

FOR IMMEDIATE RELEASE
DATE: 7/07/2020
FOR INFORMATION, CONTACT: Michael J. Clark, PE (810) 388-4027

Meisner Road between Belle River Road and M-29 in East China Township will be closed to traffic starting the week of July 13th, 2020. Work includes removing the existing bridge superstructure, installing new steel I-beams with concrete deck structure, new guardrail, HMA paving, and restoration. Meisner Road will be closed for approximately 95 consecutive days starting on about July 15th, 2020. Estimated completion date is November 6th, 2020. A detour will be posted during the closure of Meisner Road. The detour will be using King Road, Recor Road and M-29.
Access will be maintained to local traffic within the construction zone, including homes and businesses, during the closure. Emergency vehicles will have access to local properties throughout the entire project. Access across Belle River on Meisner Road will NOT be permitted. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.

This project is financed by the St. Clair County Road Commission, Millage Funds and the State of Michigan at a total estimated cost for construction of $1,999,650.77. The work will be performed by Davis Construction Company.

 

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, July 7th Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Notification

FROM: Tonia Crawford

DATE: March 9, 2020

Township: Kenockee/Wales

Road: Stapleton

Between: Brandon & Webb

Stapleton Road is closed to all traffic until further notice due to a culvert failure.

6/24/2020 Work is complete - Road is open to traffic.

MEMORANDUM

ROAD COMMISSION DEPARTMENT OF PUBLIC WORKS

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry
Westrick & Kirk Weston

FROM: Mike Clark

DATE: June 24, 2020

SUBJECT: CULVERT POSTING CHANGE in  China Twp.

Due to replacement of the culvert beams the following structure’s maximum load
rating has been increased:
Indian Trail Road over Schneider-China Drain (C28-T05) in China Twp.
Culvert is 1395 feet north of Meisner Road
Previous Posting
19 ton – Single
26 ton – Double
47 ton - Triple
NEW Posting
Current structure capacity is:
NO POSTING for Legally Loaded Vehicles

Advance Notice

Weed and Brush Control Program

St. Clair County Road Commission

The St. Clair County Road Commission will begin its 2020 Herbicide Weed and Brush Control Program on or after July 20, 2020.  Program completion, subject to weather and/or operational factors, is expected by August 15, 2020. 

The Daltons Inc., with offices at 8857 North Syracuse-Webster Road, Syracuse, Indiana, is under contract to the St. Clair County Road Commission to perform weed and brush control services in the road right-of-way on designated county roads in St. Clair County.  The method of application will be land applied by truck mounted spray units. 

The Road Commission Weed and Brush Control Program will involve the application of herbicides to weeds and brush at and around guardrails and at intersections.  The Program will be implemented to improve visibility of guardrail and safety for the vehicular traffic and/or pedestrians that use the county roads under the Road Commission’s jurisdiction.

The specific herbicide and specialty products utilized in this treatment will be as follows:

            Triclopyr                                             1 gallon                      mix per 100 gallons

            Metsulfuron                                      2 ounces                   mix per 100 gallons

            Non-ionic Surfactant                       1 quart                        mix per 100 gallons

            Drift Control                                      8 ounces                   mix per 100 gallons

            Dye                                                     Amount necessary to determine coverage

This Advance Notice and information is being supplied in accordance with the Michigan Department of Agriculture, Regulation No. 637 Pre-Notification Requirement.

If a property owner prefers their property not be included for treatment, they must complete an application form for a “No Treatment Zone” permit from the Road Commission no later than July 19, 2020.  As a condition of approval of this application, the property owner must agree to properly clear the road right-of-way abutting the subject property of weeds and brush.  Signs supplied by the Road Commission must be in place by July 19, 2020.  Posted areas will be omitted from the Program only if the area is clear of weeds and brush at the time of inspection by the Contractor and/or Road Commission personnel.

Technical information concerning this application may be requested by calling The Daltons, Inc. at 1-574-267-7511.  Administrative and operational information may be obtained from the St. Clair County Road Commission Operations Department at 1-810-388-4025. 

Kirk D. Weston

Managing Director

 

Advance Notice

Phragmites Control Program

St. Clair County Road Commission

The St. Clair County Road Commission will begin its 2020 Herbicide Phragmites Control Program on or after August 16, 2020.  Program completion, subject to weather and/or operational factors, is expected by October 1, 2020. 

The Daltons, Inc., with offices at 8857 North Syracuse-Webster Road, Syracuse, Indiana, is under contract to the St. Clair County Road Commission to perform phragmites control services in the road right-of-way on designated county roads in St. Clair County.  The method of application will be land applied by truck mounted spray units. 

The Road Commission Phragmites Control Program will involve the application of herbicides to phragmites.    The Program will be implemented to improve visibility and safety for the vehicular traffic and/or pedestrians that use the county roads under the Road Commission’s jurisdiction.

The specific herbicide and specialty products utilized in this treatment will be as follows:

Glyphosate 5.4                                 1-1/2 gallons             mix per 100 gallons of water

Imazapyr 4 SL                                  1-1/2 gallons             mix per 100 gallons of water

Non-ionic Surfactant                       1 gallon                      mix per 100 gallons of water

Dye                                                     Amount necessary to determine coverage

This Advance Notice and information is being supplied in accordance with the Michigan Department of Agriculture, Regulation No. 637 Pre-Notification Requirement.

If a property owner prefers their property not be included for treatment, they must complete an application form for a “No Treatment Zone” permit from the Road Commission no later than August 2, 2020.  As a condition of approval of this application, the property owner must agree to properly clear the road right-of-way abutting the subject property of phragmites and brush.  Signs supplied by the Road Commission must be in place by August 9, 2020.  Posted areas will be omitted from the Program only if the area is clear of phragmites and brush at the time of inspection by the Contractor and/or Road Commission personnel.

Technical information concerning this application may be requested by calling The Daltons, Inc. at 1-574-267-7511.  Administrative and operational information may be obtained from the St. Clair County Road Commission Operations Department at 1-810-388-4025. 

Kirk D. Weston

Managing Director

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, June 16nd Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

FOR IMMEDIATE RELEASE
DATE: JUNE 4, 2020
INFORMATION CONTACT: BILL HAZELTON, 810-388-4026

Bricker Road from Brandon Road to Webb Road in Kenockee/Wales Township will be closed from June 8 to June 10.
Work includes regrading area leading up to the railroad crossing and placing an asphalt ramp along with repaving the crossing area. The detour for the project will be O’Neil Road.

Traffic will not be permitted across the railroad tracks during the closure as the crossing surface is going to be removed. Local residents will have access to their property from either side of the railroad crossing. We request your cooperation and patience.

FOR IMMEDIATE RELEASE
DATE: JUNE 3, 2020
INFORMATION CONTACT: BILL HAZELTON, 810-388-4026

Mayer Road over Cooper Drain in St. Clair Township will be closed on June 4, 2020.

Work includes Regrading area where the culvert was replaced earlier this year and placing multiple layers of new asphalt pavement. This work will complete the work completed in February that involved removing and replacing the existing culvert.

Mayer Road is closed from 300’ north of Gratiot to Gratiot Road. The detour for the project will be Rattle Run Road and Gratiot Road.

Traffic will not be permitted across the Cooper Drain during the closure. Local residents are encouraged to plan for delays. We request your cooperation and patience.

Road Closure Notification

FROM: Tonia Crawford

EXTENSION: 4021

DATE: June 2, 2020

Township: Kimball

Road: Richman

Between: Main & Smiths Creek Rd

Richman Road will be closed to all traffic 06/05/2020 through 06/13/2020 Due to Railroad Crossing rebuild. Per: CN Railroad

FOR IMMEDIATE RELEASE
DATE: JUNE 1, 2020
INFORMATION CONTACT: BILL HAZELTON, 810-388-4026

Range Road Double Microsurface is scheduled to begin June 1, 2020.


Resurfacing work on Range Road from Carney to Davis is scheduled to begin on June 1, 2020.
Work will include filling the wheel ruts and then placing a new wearing surface over the entire roadway. This work will be completed under a lane closure utilizing flaggers.
Access will be maintained to traffic within the construction during the project. Local residents are encouraged to plan for delays due to construction. We request your cooperation and patience.
Construction is scheduled to be completed by June 12, 2020. All scheduling and project dates are subject to change depending on weather and the contractor’s schedule.
This project is financed by the St. Clair County Road Commission, the State of Michigan and the Federal Highway Administration at a total estimated cost for construction of $266,292. The prime contractor is Pavement Maintenance Systems.

Special Announcement

Per the Governor’s Executive Order, the Board of Public Works and the Board of Road Commissioners Tuesday, June 2nd Meetings will be held by conference call at 7 pm: To participate by phone, call:  1-313-209-3070 Then enter conference code 641449

Road Closure Notification

FROM: Tonia Crawford

DATE: May 28, 2020

Township: China

Road: Indian Trail

Between: Lindsey Ln & Meisner

Due to a Bridge Replacement Project Indian Trail will be closed to all traffic 06/01/2020 through 06/15/2020.

MEMORANDUM

ROAD COMMISSION DEPARTMENT OF PUBLIC WORKS

TO: Bill Hazelton, Brette Stager, Tonia Crawford, Andrew McNiff, Jerry
Westrick & Kirk Weston

FROM: Mike Clark

DATE: May 27, 2020

SUBJECT: BRIDGE POSTING CHANGE in East China Twp.

Due to advancing steel deterioration the following structure’s maximum load
rating has been decreased:
Meisner Road over Belle River (10-1P) in East China Twp.
 Bridge is 2170 feet West of M-29
Previous Posting
16 ton – Single
18 ton – Double
22 ton - Triple
NEW Posting
Current structure capacity is:
8 ton – Single
8 ton – Double
8 ton – Triple

FOR IMMEDIATE RELEASE

DATE: 5/22/2020

FOR INFORMATION, CONTACT: Michael Clark (810) 388-4027

Starville Road between Shea Road and Angling Road in Cottrellville
Township will be OPEN to Traffic at 3:00 pm today, May 22, 2020.

Work included removing the existing bridge, installing a new precast concrete and steel
bridge, new guardrail, asphalt paving, and site restoration.

This project was financed by the St. Clair County Road Commission, Millage Funds and
the State of Michigan at a total estimated cost for construction of $1,160,189.60. The work
was performed by Z Contractors, Inc.