Permits Fees:

TRANSPORTATION PERMITS

(a) Extended Transportation Permit $100 first permit/$25 each additional oversized/overweight item
(b) Haul Route (Class A on a B road)     $250
Milk Hauler/Agricultural Commodities (Seasonal)     $75
Building/Modular Move Permit     $30
Building/Modular Move Permit (One time only) Deposit $1,000 $140
(a) Single Move (Round Trip)     $25
(a) Single Move (Multiple Trips)     $50
Temporary Road Closure     $180
Seasonal Utility Permit (During Weight Restrictions)     $75

UTILITY PERMITS: (C)

Established Utilities: Continuous Surety Bond-$20,000 ground; $20,000 aerial Additional Inspection Fees will be billed
Overhead Utility Installation     $120
Underground Utility Installations (Trenching) $0.10 per ft over 1000   $170
Annual Utility Permit   $300
Advance Notices (First 10 under Annual Permit) each     $30
(d) Open Cut Road Crossing Refundable Inspection Deposit $500 $170
    Each Additional Cut      $100
(d) Bore Road Crossing Refundable Inspection Deposit $500 $170
     Each Additional Bore      
       
SMALL WIRELESS COMMUNICATION FACILITIES PERMITS:      
New Small Cell Wireless Facilities Stand-alone small cell facility (each)   $200
New Small Cell Wireless Facilities and new poles Each pole or support structure (each)   $300
(g) Collocated rate on utility poles Recurrent rate per year per utility pole   $20
(g) Collocated rate on utility poles Recurrent rate per year per wireless support structure   $20
(g) Collocated rate on utility poles (erected by or on behalf of the wireless provider on or after 03/12/19) Recurrent rate per year per pole   $125
(g) Collocated rate on utility poles (erected by or on behalf of the wireless provider on or after 03/12/19) Recurrent rate per year per wireless support structure   $125
(h) Collocated antennas on road agency poles Per facility per year per each agency pole   $30
       
TELECOMMUNICATION AND/OR VIDEO SERVICE PROVIDER PERMITS:      
(i) Permit to work in the Road Right-of-way Per Permit   $300
(i) Permit to work in the Road Right-of-way Per Project (Consider one contiguous road segment)   $1000
(i) Permit to perform routine maintenance/repair work Per year   $300
(i) Security Bond or right-of-way bond     $20,000

CONSTRUCTION WITHIN THE RIGHT-OF-WAY (C)

General Work in Right-of-way     $170
(c) Residential Driveway (New installation) $65
  Inspect Existing   $45
  Resurface Existing   $45
  Replace damaged culvert N/C
Farm Field Driveway     $15
(e) Commercial Drive/Road Approaches Refundable Damaged Culvert $500 $275
  Additional Drive   $120
  Resurface Existing   $140
Temporary Construction Driveway Refundable Deposit $700 $140
Landscaping****** Refundable Inspection Deposit $500 $70
Ditching Refundable Inspection Deposit $750 $70
Sidewalk Approach     $45

MISCELLANEOUS FEES

Tree/Brush Removal     $0
Geophysical Surveys/Soil Borings     $85
Land Divisions / Lot Splits     $50
  Per additonal split   $25

PUBLIC ROAD DEDICATION/SUBDIVISIONS

Preliminary Plan/Plat Review     $150
Construction Plan Review Each Revision $100 $300
       
Final Road Acceptance     $300

INSPECTION FEES

Regular time Cost will be billed at the current hourly rate for the employee and equipment involved, plus fringe benefits and overhead
Overtime Costs will be billed at 1.5 times the current hourly rate for the employee involved, plus the regular rate for the equipment involved, plus fringe benefits and overhead.
Inspection Charges will be billed on a monthly basis using an itemized statement.  The applicant will be liable for any and all permit inspection fees.
NOTES:
(a) First time applicants are required to supply a $10,000 continuous Surety Bonds for all oversized moves.
(b) Haul Routes - Letter of credit - $5,000 per mile of gravel roadway and $20,000 per mile of asphalt roadway
(c) Inspection Fees are applicable for Utility Permits, Commercial Approaches and Non-Compliant Residential Drives when the cost of inspection exceeds the total permit fees paid.
(d) Open Cut/Bore Roadway 
          Gravel Road   - LOC/Cash Deposit - $1,000 and Surety Bond - $1,000
          Asphalt Road - LOC/Cash Deposit - $1,500 and Surety Bond - $3,000
(e) Commercial Drive Approach 
          Gravel Road  - Surety Bond - $  5,000
         Asphalt Road - Surety Bond - $10,000
(f) Landscaping - A signed contract between the landowner and the RC that the landowner will be responsible for meeting the permit requirements, within a set period of time or the RC will complete the project and bill the landowner for labor, equipment and materials; or ditch enclosures will be constructed by RC at landowner's expense.
(g) Collocation recurrent rates on utility poles or wireless support structures are in addition to and distinct from the wireless provider's permit fee.
(h) Collocation recurrent rates on road agency poles are in addition to and distinct from the wireless permit fees.
(i) Provider shall maintain general liability insurance with minimum policy limits of $2,000,000 per occurrence of property damage and $2,000,000 per occurrence for bodily injury.
 

All Plan Reviews Require Three (3) Sets of Engineered Plans

Revised 05/16/2019

 